PARQUE SANTIAGO III & IV
Camison Beach, APARTAMENTO SANTIAGO III & IV provides beachfront accommodation with a restaurant, an outdoor swimming pool, a bar and free WiFi. Guests benefit from a patio and a barbecue.
Located in Playa de las Americas, just 200 m from
The apartment features 2 bedrooms, a flat-screen TV with cable channels, an equipped kitchen with a microwave and a fridge, a washing machine, and 1 bathroom with a bidet.
Speaking English, Spanish, Italian and Portuguese, staff at the reception can help you plan your stay.
The apartment offers a terrace. A water park and a children's playground are available at APARTAMENTO SANTIAGO III & IV, while guests can also relax in the garden.
Popular points of interest near the accommodation include El Bunker Beach, Las Vistas Beach and Piramide de Arona Convention Centre. The nearest airport is Tenerife Sur, 18 km from APARTAMENTO SANTIAGO III & IV, and the property offers a paid airport shuttle service.
REFURBISHMENT WORKS OF COLD WATER SWIMMING POOL PSIV parque santiago iv
Location: Cold Water Swimming Pool Parque Santiago IV
Job Description: The cold water swimming pool in Parque Santiago IV will be refurbished due to several damages.
The work will consist of:
- Emptying the pool.
- Repair of damage (small patches, cracks and areas of wear of the paint).
- Painting
- Filling the pool
-
*The heated pool will remain in use during the repair of the other pool and can be used at all times.
Dates: start 02/05/2023 and finish 19/05/2023
Noise Level: This refurbishment does not involve noise or disturbance, as it will be mainly painting work.
Days and hours of work: Monday to Sunday from 9:00 to 17:00 (work that may involve noise will start from 10:00).
REFURBISHMENT WORKS OF FLATS WING-B OF PARQUE SANTIAGO IV
The Second Phase of the refurbishment of Wing B of Parque Santiago IV will be undertaken.
Location: WING B: APARTMENTS
Job Description: Renovation of the interior of the flats (about 82 approx.)
Dates: Start 02/09/2024 and finish 20/12/2024
Noise Level: Medium the first phase, (six first weeks) of the work and low the rest of the work.
*The noise level is low due to the fact that the work will be carried out within the grouping,
The noise level is low due to the fact that the work will be carried out within the group, being perfectly enclosed and isolated from the perimeter of the rest of the complex.
Working days and hours: Monday to Friday from 9:00 to 17:00 (work that may involve noise will start from 10:00).
It will be possible to work sporadically on Saturdays to advance work (in this case it will be work that does not involve noise).
Blocked zone for acoustic buffer": the red zone will be blocked off so as not to accommodate any clients, creating a sufficient distance between the construction site and the accommodated clients so as not to disturb the noise.
It will not be necessary to close any facilities or equipment during the renovation period, so the complex will continue to operate with its full range of services.